Flashing Details
Jun23
This beam flashing detail is often overlooked and having the he lather caulk around the beam and paper will fail pretty quick. Any connection that has a lot of contraction and expansion going on needs a closer look, simply caulking stucco to the beam will not prevent moisture from starting dry rot. By caulking to a properly installed metal flashing you can prevent some call backs.
Fire Damage
Jun17
Sherman Oaks Condo
Jun13
My job site trailer was in the parking lane on Burbank Blvd for this project, the rush hour traffic was crazy in the morning, a 26 unit in Sherman Oaks. The construction ran smoothly and on schedule thanks to a great team.
I was really happy the day I moved out the job trailer and relocated my site office into a unit.
Studio City Condominium
Jun13
Considering all the time spent with Schaffel Development as a Superintendent/Project Manager and Director of Construction building condo projects, I thought I’d add some pictures of projects I was involved in.
This first Studio City condo project was a lot of fun doing, small enough to be easily managed (14 units), good plans, office support and subs. Construction was type 5, concrete deck above partial subterranean parking and typical construction of many similar multi- family buildings in this area.
Special thanks to:
- Gary Schaffel, Schaffel Development
- Kamran Tabrizi, Architect
- Masoud Dejban, Structural Engineer
- Brian Price, Demo & Grading
- Tim Mitchell, Mitchell Environmental Concrete